Point Handover Introduction

FAQ

1.Time

Within 7 days after the establishment of the management committee or the election/designation of the person in charge of management.

2.Statutory Items

Water and electricity, mechanical facilities, fire-fighting facilities and various pipelines

3.Documents required by the owner

1.Maintenance manuals and manufacturer's information for the use of facilities and equipment

2.Transcript of license

3.As-built drawings and drawings of water and electricity, mechanical facilities, and fire-fighting pipelines

For details, please refer to Article 57 of the Condominium Building Regulations

Process

簽約

與委託單位確認社區檢查的設備項目。

會前會

敲定細節,說明排程。

總檢當天

檢查各項設備及拍攝缺失。

製作缺失報告書

呈送給委託單位。

等待建商改善缺失
複檢當天

複檢當天

製作完整報告

送給建商及社區委員會。

Please leave it to us

專業
擁有消防檢修機構認證、甲級電氣承裝業、乙級空調承裝業、電梯特許承裝業等資格。
品質
連續超過20年獲得ISO-9001國際品質認證。
迅速
使用APP照相,加快檢驗流程。
高機動性
全台超過500位工程師,急件也有充足能力。
從台北到高雄,不論案場大小或距離提供服務。